Product Lead Times

Product Lead Times

Lead times are offered as general guidance for standard products, and they may fluctuate depending upon timing and the models ordered. In addition, products with modifications may have extended lead times. However, call if you have an urgent requirement. Clemco will do its best to accommodate requests whenever possible.

Updated: 07/22/2024

Contractor Solutions

Contractor Solutions Lead Times

Industrial Solutions

Industrial Solutions Lead Times

*Engineered Solutions (Blast Rooms, Automation, Robotics): Lead times for engineered solutions vary depending on project complexity and current production scheduling. Special expediting may be possible depending on the engineered solution, and this need must be communicated to Clemco’s field sales manager prior to submitting an order and with mutual agreement from Clemco. Lead times begin after signed approval drawings are received from customers. When an order is ready to be placed, always consult Clemco’s field sales manager for the lead time that will apply to your engineered solutions.

Abrasive blasting (formerly known as sandblasting) also is called grit blasting, bead blasting, media blasting, soda blasting, dry blasting, sponge blasting, shot blasting, and shot peening. However, sand should never be used when abrasive blasting because breathing abrasive containing crystalline (free) silica can lead to serious or fatal lung disease.